7/21/25 – Riverbend
Good Morning, Port Imperial!
Here’s a fresh aerial look at our latest progress—taken right from above the Hudson River, with Manhattan on the horizon.
This 12-story, 585,000 SF building is now just weeks away from structural completion.
Our crews are pushing hard, installing the last of the pre-panelized cold-formed steel load-bearing walls and structural steel framing that supports the entire plank system.
Let me ask you something:
Have you ever seen a building of this scale go up with this level of efficiency—using this kind of CFSteel prefabricated wall and floor system?
It’s been one incredible ride, and we’re proud to be setting the standard.
Experienced. Efficient. Extreme.



Read Full Post HERE